What's included

What goes into the lock package

  • Final review confirming the database matches the approved data management plan and edit check specifications
  • All plans, logs, and DM reports referenced throughout conduct verified complete and filed
  • Outstanding documentation gaps identified and closed before sign-off
  • Records reconciled into a single, organized lock package rather than left scattered across the study file
  • Final package structured to support inspection readiness requirements

Everything accounted for

Confirms every plan and report referenced throughout the study, from the DMP to DM reports, is complete and filed.

The paper trail behind the lock

Supports inspection readiness by giving auditors one complete, organized record.